Safety First Photo Gallery : Operational Safety
 73 images in this album on 5 pages  [slideshow] [login]  
 Gallery: Safety First Photo Gallery   
First Page Previous Page   1  2  3  4  5   Next Page Last Page

Typical double-falls lifeboat (22 person capacity)
Viewed: 389 times.
Platform installation offshore Trinidad
Viewed: 396 times.
Production Platform final details before First Gas
Viewed: 364 times.
Production Jacket being prepped for the Topsides unit
Viewed: 358 times.
Heavylift vessel crane hook - Safe Working Load of 5000 Tonnes!
Viewed: 377 times.
Night shift activity
Viewed: 405 times.
Night shift activity
Viewed: 365 times.
The Topsides Approach...
Viewed: 353 times.
Offshore workhorse - offshore guardian
Viewed: 397 times.
The Topsides unit being prepared for the lift
Viewed: 360 times.
Topsides at night - the Lift has begun!
Viewed: 370 times.
Topsides unit in mid-lift
Viewed: 381 times.
Lifting the Flare Boom for installation
Viewed: 347 times.
Easing the Flare Boom into final position
Viewed: 363 times.
An installed offshore platform - ready for commissioning
Viewed: 378 times.
Seismic vessel - bow
Viewed: 392 times.
Seismic vessel - stern (the business end)
Viewed: 361 times.
Remotely controlled watertight door - A deadly hazard if you are not careful
Viewed: 346 times.
First Page Previous Page   1  2  3  4  5   Next Page Last Page
 Gallery: Safety First Photo Gallery   
All Images ©2003 Safety First Industrial Safety Services